Reserve studies for HOAs & condominiums

A funding plan your board can defend.

Cascade Project Group prepares independent reserve studies and maintenance plans for Oregon associations. Every component is walked and verified in the field, and every number is tied to a 30-year plan your owners can understand.

Draft report within 2 weeks of the site visit · Level I studies from $1,800 · Built for ORS 94.595 & ORS 100.175

Field-verifiedEvery component walked, measured and photographed
Finance-literateFunding plans built by a former financial advisor
Statute-readyReserve study + maintenance plan in one report
Draft in 2 weeksDraft report within two weeks of the site visit
What you get

More than a spreadsheet of replacement dates.

A reserve study answers two questions every board gets asked: what will we need to replace, and are we saving enough to pay for it? Your report gives the board a clear answer, the math behind it, and a plan to adopt.

  • Fewer surprise special assessments
  • Dues increases you can explain and justify to owners
  • Documentation for lenders, buyers and insurers
  • An annual update path, so the study never goes stale
View the Sample Study Get a Quote
01
Executive summaryPercent funded, recommended contribution and the key decisions in one page.
02
Component inventoryEvery common-area component with quantity, condition, useful life, remaining life and photos.
03
Replacement cost estimatesCurrent regional pricing from 25+ years building and managing construction.
04
30-year cash-flow projectionYear-by-year contributions, expenses, interest and ending balance.
05
Funding scenariosBaseline, threshold and full-funding plans compared side by side.
06
Maintenance planRoutine inspection and upkeep tasks, kept separate from reserve items.
Why Cascade Project Group

Builder's eye. Advisor's math.

Most reserve studies are either strong on construction or strong on finance. Yours should be both.

01

Field experience, not guesswork

Over 25 years in construction, from custom homes to LEED Platinum builds and hospitality projects. Useful lives and costs come from having built, repaired and replaced these components.

02

Funding plans that hold up

A background as a financial advisor means your cash-flow model, percent-funded figures and contribution schedule are built properly and explained clearly.

03

Independent and direct

No contractor upsell and no hidden agenda. You work directly with the person who walks your property and writes your report.

Study types

The right level of study for where you are.

Oregon associations are expected to keep their reserve study and maintenance plan current every year. Pick the level that fits, or ask and we'll recommend one.

Level II

Update with Site Visit

Existing study needs a real refresh
Fixed-fee quote
  • Review of your prior study and financials
  • Site visit to re-verify condition and life
  • Updated costs and funding plan
  • Maintenance plan refreshed
Request a Level II quote
Level III

Annual Update

Keeping a recent study current
Fixed-fee quote
  • Updated balance, costs and inflation
  • Board-reported projects rolled in
  • Revised contribution recommendation
  • Ideal for multi-year agreements
Request a Level III quote

Managing several communities? Ask about multi-property and multi-year pricing.

Process

From first call to board meeting.

Your draft report arrives within two weeks of the site visit, so the board has numbers in hand well before budget season.

Step 1

Scope & proposal

A short call and your documents: prior study, budget, plat and recent projects. You get a fixed-fee proposal.

Step 2

Site visit

Every common-area component is inspected, measured and photographed on site.

Step 3

Draft in 2 weeks

Costs, lives and the 30-year model are built, and the draft is in your hands within two weeks of the site visit for review with the board or manager.

Step 4

Final report

Board comments are worked in and the final study and maintenance plan are delivered, ready to adopt.

Who you'll work with

Andy Nelson, Founder

I started in the field and spent more than 25 years building and managing construction: custom homes, restaurant and hospitality build-outs, LEED Platinum projects, and older buildings where envelope repair was part of the job. Before that, I worked as a financial advisor.

That combination is the point. I know what it takes for a roof, a fence or a private drive to reach the end of its life, and I know how to build a funding plan that gets an association there without a crisis. I walk every property myself and write every report myself.

25+ years in construction Former financial advisor Building envelope consulting OR · WA · CA · ID
Common questions

What boards and managers ask.

Is a reserve study required in Oregon?

Yes, for most associations. Oregon law requires planned communities (ORS 94.595) and condominiums (ORS 100.175) to maintain a reserve study and a maintenance plan, and to review and update them annually. Your governing documents may add their own requirements.

What's the difference between a reserve study and a maintenance plan?

The reserve study covers major components the association will eventually replace or repair, and how to fund that. The maintenance plan covers routine inspection and upkeep that keeps those components reaching their full life. Both come in one report.

What does "percent funded" mean?

It compares your actual reserve balance to the amount that, in theory, should be set aside based on how much of each component's life has been used. It's a useful health check, but the 30-year cash flow matters more. The sample study shows both.

What do you need from us to get started?

Your most recent reserve study (if any), current reserve balance, this year's budget, a site plan or plat, and a list of major projects completed recently. If you don't have all of it, we can work with what you have.

How long does a study take?

Your draft report is delivered within two weeks of the site visit. Most of the remaining time is board review. The final report follows as soon as comments are back.

How much does a reserve study cost?

Level I full studies start at $1,800. Updates are quoted per community based on the number and type of components and the study level. Every proposal is fixed-fee, and multi-year agreements and management-company portfolios are priced lower per study.

Do you work outside Salem?

Yes. The Willamette Valley is home base, including Salem, Keizer, Albany, Corvallis and Eugene, and studies are available throughout Oregon, Washington, California and Idaho.

SalemKeizerAlbanyCorvallisEugenePortland metroBendWashingtonCaliforniaIdaho
Request a quote

Tell us about your community.

A few details are enough to scope your study and send a fixed-fee proposal, usually within one business day. Once you're on the schedule, your draft report arrives within two weeks of the site visit.

Based inSalem, Oregon
You
The community
No obligation. Your info goes only to Cascade Project Group.